Air Conditioning System Design (HVAC)

Eligibility :

Fresh/ Experienced – Diploma /Degree in Mechanical / Production Engineers.

The design of the HVAC component is critical to achieve an efficient and effective environmental control system. The successful integration of building constraints, air movement conditions and equipment selection can positively impact system overall performance and decrease utility expenses and capital expenditures. To achieve the optimal design, one should needs good analytical skills and up-to-date technical knowledge of various system designs.

Key Points of Syllabus

Introduction to:

 Role of HVAC engineer in industry &Role of HVAC Engineer in industry

Detailed study of:

·              Heat Load calculation

·              Psychometric Charts and their use indesigning

·              Duct Sizing and layouts guidelines

·              Energy, Heat, Unit conversion

·              Thermodynamics Iaws, system,surrounding, process

·              Vapor compression cycle

·              Ventilation system

Selection & study of :

·              Air Conditioning System

·              System Component like AHU, Chillers,Cooling Towers, Pumps, Blowers,   Diffusers,grills; filters & dampers

·              Design and Analysis of comforts,Thermal Storage

·              AC system for various applications,viz.: Shopping mall; hotel, pharma and industry etc.

·              Guidelines of Material Selection andBMS (Building Management Systems)

·              HVAC Piping Selection and installationguidelines

·              Vapour Absorption cycle and machine

·              Vapour Absorption Application

·              Study of VRV / VRF System & itsApplication

·              Pipe Routing for VRV / VRF

Equipment & Instrument in HVAC

·              Equipments, viz.: WRAC; split AC;package units; AHU &chiller packages

·              Instrument required for fieldmeasurement, inspection & quality control

·              Guidelines for Construction,Installation and Troubleshooting

·              Checking of Vendor Data

·              Code review and basics of Firefighting design

·              Introduction to Components of fireprotection system

·              Raw / gery water under ground andoverhead tank sizing along with pump selection

·              Introduction to components of plumbingand drainage system and their selection criteria.

·      

Objective
  • ·        To provide clear understanding of the key aspects of system

    ·        To provide practical & effective methods and guidelines to assist cost effective new installations of high technical integrity as well as trouble shooting & improving existing system

Batch No. Category Planned Starting Date Last Date of Admission Completion Date Duration Timings
07064 Full Time 01-Jul-2019 24-Jun-2019 31-Jul-2019 1 Month Monday to Saturday 8.00 am to 1.00 pm
07065 Weekend Batches 15-Sep-2019 08-Sep-2019 15-Dec-2019 3 Months Sunday 8.00 am to 5.30 pm
07066 Full Time 01-Jan-2020 25-Dec-2019 31-Jan-2020 1 Month Monday to Saturday 8.00 am to 1.00 pm
Batch No. Planned Starting Date
07064 01-Jul-2019
  • Category : Full Time
  • Last Date of Admission : 24-Jun-2019
  • Completion Date : 31-Jul-2019
  • Duration : 1 Month
  • Timings : Monday to Saturday 8.00 am to 1.00 pm
07065 15-Sep-2019
  • Category : Weekend Batches
  • Last Date of Admission : 08-Sep-2019
  • Completion Date : 15-Dec-2019
  • Duration : 3 Months
  • Timings : Sunday 8.00 am to 5.30 pm
07066 01-Jan-2020
  • Category : Full Time
  • Last Date of Admission : 25-Dec-2019
  • Completion Date : 31-Jan-2020
  • Duration : 1 Month
  • Timings : Monday to Saturday 8.00 am to 1.00 pm

Enquiry Form

Testimonial